The Project Pre-Mortem Generator

30 questions to find the holes in your plan before you commit resources.

"If this project fails in 6 months, what was the most likely cause?"

Sample from 30 challenging questions designed to surface blind spots before they become problems.

Start Pre-Mortem

30 killer questions • Find blind spots • Free red team simulation

The Confirmation Bias Trap: Why Teams Fall in Love with Bad Ideas

Every team falls in love with its own ideas. Once a decision feels right, people stop questioning it. Objections get dismissed as "negativity." Skeptics stay quiet to avoid being labeled difficult. The group converges on optimism, and nobody mentions the obvious risks until it's too late.

Psychologists call this confirmation bias: once you believe something, you unconsciously filter information to support that belief. You notice evidence that confirms your plan. You ignore signals that contradict it. By the time reality forces correction, you've already spent months and resources on a flawed strategy.

The cost is brutal. Product launches fail because nobody asked "What if customers don't care?" Hires go wrong because nobody challenged "What if this person can't scale with us?" Pivots flop because nobody questioned "What if we're solving the wrong problem?"

Pre-mortems break this pattern. By forcing teams to assume failure and work backward, you externalize the skepticism that's missing. You create permission to name risks without sounding obstructionist. The questions become the "bad guy," not the person asking them.

How to Run a Pre-Mortem: The Red Team Method

A pre-mortem is the opposite of a post-mortem. Instead of analyzing failure after it happens, you imagine failure before you commit—then work backward to identify what went wrong. This mental time-travel reveals risks that optimistic planning misses.

The Pre-Mortem Process

  1. Set the scene: "It's 6 months from now. This project has failed spectacularly. What happened?"
  2. Brainstorm causes: Everyone independently lists reasons for the imagined failure.
  3. Surface the risks: Share all responses. Look for patterns—if multiple people mention the same risk, it's real.
  4. Pressure-test assumptions: Use challenging questions (like the 30 in this tool) to interrogate weak spots.
  5. Adjust the plan: Either fix the risks, add mitigation, or explicitly accept them with eyes open.

The power of this method: by assuming failure, you remove the social pressure to be supportive. People can name concerns without seeming disloyal. Junior team members can raise objections that would sound presumptuous in normal planning. The pre-mortem creates psychological safety for skepticism.

Research shows teams that run pre-mortems identify 30% more risks than traditional planning. More importantly, they catch the critical failures—the ones nobody wanted to mention because they contradicted the group's optimism.

When to Run a Project Pre-Mortem

Investment Decisions

Before committing budget to a new initiative, run a pre-mortem to identify why the investment could fail. Surface risks about market timing, competitive response, or execution capability before capital is deployed.

New Product Launch

Before shipping, imagine the product fails. Was it poor positioning? Missing features? Wrong target customer? Pre-mortems catch launch risks that beta testing misses because they challenge strategic assumptions, not just technical execution.

Hiring C-Level Executives

Before extending an offer for a critical hire, run a pre-mortem on fit risks. Imagine this person fails in 12 months—why? Culture mismatch? Skill gaps? Misaligned incentives? Better to surface doubts before the hire, not after.

Strategic Pivots

When leadership proposes a major direction change, imagine the pivot fails. Was the original diagnosis wrong? Did we underestimate switching costs? Are we pivoting away from our actual advantage? Pre-mortems prevent expensive strategic errors.

Acquisition Integration

Before finalizing M&A, imagine the acquisition destroys value. Was the tech stack incompatible? Did key talent leave? Were synergies imaginary? Pre-mortems reveal integration risks that due diligence misses.

Quarterly Planning

Before locking in OKRs, run a pre-mortem on the quarter. Imagine we miss all targets—why? Overcommitted capacity? Dependency on external teams? Misaligned priorities? Surface planning flaws before execution begins.

Ready to Stress-Test Your Strategy?

Work through 30 challenging questions designed to surface blind spots, weak assumptions, and hidden risks.

Start Pre-Mortem

Frequently Asked Questions

What is a project pre-mortem?

A pre-mortem is a risk assessment technique where teams imagine a project has failed, then work backward to identify what went wrong. Unlike traditional planning (which asks "What could go wrong?"), pre-mortems assume failure has already happened and ask "Why did this fail?" This mental shift removes optimism bias and surfaces risks teams would otherwise dismiss. Research shows pre-mortems identify 30% more failure modes than standard risk planning because the failure assumption gives people permission to voice doubts without seeming negative.

How to facilitate a risk assessment workshop?

Effective risk assessment workshops require structured skepticism, not open-ended brainstorming. Start by framing the exercise: "It's 6 months from now, this failed—why?" Have participants independently list failure causes (prevents groupthink). Then share responses and look for patterns. Use challenging questions (like the 30 in this tool) to interrogate assumptions. Focus on risks that cluster—if multiple people mention the same concern, it's probably real. End by categorizing risks: which can be mitigated, which must be accepted, which should kill the project. The goal isn't consensus—it's surfacing what people privately worry about but won't say publicly.

What questions to ask during strategic planning?

Strategic planning questions should challenge assumptions, not just generate ideas. Key questions include: "What assumptions are we making that, if wrong, kill this strategy?" "If this fails, what was the most likely cause?" "What would have to be true for this to succeed?" "Who has tried this before and why did they fail?" "What's the earliest signal that we're wrong?" "If we had 10% of the resources, what would we cut?" These questions force specificity—vague strategies hide weak thinking. The best strategic planning questions make people uncomfortable because they expose gaps between confidence and evidence.

Is this the same as a post-mortem?

No. Post-mortems happen after failure to learn what went wrong. Pre-mortems happen before commitment to prevent failure. Post-mortems are retrospective analysis. Pre-mortems are prospective risk assessment. Both use similar techniques (assume failure, work backward to causes), but the timing is opposite. Pre-mortems are more valuable because they influence decisions before resources are committed. Post-mortems document lessons but can't undo sunk costs. The best teams do both: pre-mortems before launch, post-mortems after completion.

Can this tool kill a good idea?

If a good idea dies from structured questioning, it wasn't actually good—it was fragile. Strong strategies survive pre-mortems because the team can articulate responses to hard questions. Weak strategies collapse under scrutiny because they rely on unexamined assumptions. The goal isn't to kill ideas—it's to strengthen them by forcing teams to address risks proactively. If the pre-mortem reveals fatal flaws, you've saved resources that would've been wasted on eventual failure. If the idea survives, the team proceeds with conviction, knowing they've stress-tested the plan.

How long should a pre-mortem take?

For major decisions (product launches, strategic pivots, key hires), allocate 60-90 minutes. For smaller decisions, 20-30 minutes suffices. The time investment scales with downside risk—high-stakes decisions deserve thorough pre-mortems. Don't rush the process to reach consensus quickly; the value comes from surfacing uncomfortable truths that people hesitate to voice. If everyone agrees the plan is perfect within 10 minutes, you're not asking hard enough questions. Effective pre-mortems feel tense because they challenge the group's preferred narrative.

Do I need to create an account?

No. This pre-mortem tool is completely free and requires no signup. Click "Start Pre-Mortem" to access 30 challenging questions immediately. Use it before product launches, investment decisions, strategic pivots, or any high-stakes choice where the cost of failure is significant. No data collection, no barriers—just structured skepticism to stress-test your thinking before you commit.